Examples
Worked examples
- Is an instance
A postdoc leaving a project completes a checklist: data deposited in the repository, code committed, sample inventory transferred to the lab manager, system access revoked.
- Is an instance
A consortium partner withdrawing mid-project completes formal offboarding, including amendment to the GA and CA.
Counter-examples
Looks similar, but isn't
- Not an instance
A short absence, such as sabbatical or parental leave, is not offboarding.
- Not an instance
A team member changing roles within the same project is not offboarding.
Editorial commentary
Project offboarding is the structured process of taking a person — or, at project end, an entire team — out of active involvement in a project: transferring custody of data, code, and physical materials; revoking system access; returning institutional or sponsor property; and capturing anything left unfinished. It applies both mid-project, when an individual leaves (a postdoc moving on, a consortium partner withdrawing), and at the very end, when the whole project winds down.
How it differs from closeout and hand-off
Offboarding is not the same as the closeout phase: closeout is the sponsor-facing administrative and financial wind-down of the award itself (final reports, final expenditure reconciliation, equipment disposition per sponsor rules), while offboarding is about people and their access — it can happen at closeout, but also happens independently whenever someone leaves. It is also not the same as a hand-off in general: a hand-off can be a lateral, continuing transfer of responsibility between two active roles or teams, whereas offboarding specifically concludes one person’s or one project’s involvement — it uses hand-off practices, such as briefing documents and joint meetings, as part of how it is done, but is narrower in scope.
What it includes and what follows
A thorough offboarding checklist covers documenting ongoing or unpublished work, depositing lab notebooks and electronic records, transferring custody of samples and equipment, returning institutional or sponsor property, revoking access to project systems, and an exit interview that often feeds a lessons-learned exercise — offboarding produces that input, but the lessons-learned document itself is a separate, structured artefact. Poor offboarding is a leading cause of orphaned data and lost institutional memory. At project end, offboarding runs alongside closeout and feeds into the archive phase that follows.
A recurring institutional gap
Offboarding is frequently under-specified in institutional policy compared with onboarding: many institutions have a detailed new-hire checklist but no equivalent structured exit checklist for research staff, which is why the burden of remembering every step often falls on the departing individual rather than on a system designed to catch it.
Also known as
Project exit · Personnel offboarding · Project departure
Machine-readable encodings
Use in your systems
<role vocab="credit"
vocab-identifier="https://casrai.org/dictionary/"
vocab-term="Offboarding (project)"
vocab-term-identifier="https://casrai.org/dictionary/term/offboarding-project" />{
"@context": "https://schema.org",
"@type": "DefinedTerm",
"@id": "https://casrai.org/dictionary/term/offboarding-project",
"name": "Offboarding (project)",
"identifier": "https://casrai.org/dictionary/term/offboarding-project",
"description": "The structured process of transitioning a team member, or an entire project, out of active involvement, including knowledge transfer, data and code hand-off, access revocation, exit interview, and documentation of outstanding items -- distinct from the award-level closeout phase.",
"inDefinedTermSet": "https://casrai.org/dictionary/domain/research-lifecycle#set",
"url": "https://casrai.org/dictionary/term/offboarding-project",
"sameAs": [
"Project exit",
"Personnel offboarding",
"Project departure"
],
"license": "https://creativecommons.org/licenses/by/4.0/",
"publisher": {
"@id": "https://casrai.org/#organization"
},
"author": {
"@id": "https://casrai.org/#editorial-team"
},
"datePublished": "2026-05-21T02:23:00",
"dateModified": "2026-08-22T16:08:01",
"inLanguage": "en-GB",
"isAccessibleForFree": true
}







